Thursday, April 26, 2012

Rainy Day Metal with a Side of Pantera

 Yesterday I went down to Phoenix and picked up the galvanized metal for the interior of the grow houses and the exterior of the laboratory, 59 (20 foot by 3 foot) pieces in all should do it!  The next step is to finish off the drains that will be sent out to a drain line past the fields out back of the barn, equipped with a p-trap and grated off.  Then I'll seal the concrete floors of the grow rooms and put up the metal interior.

No comments:

Post a Comment